User Tools

Site Tools


en:monitoring_and_warning:sprobes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
en:monitoring_and_warning:sprobes [2023/06/05 07:43] m-gamperlen:monitoring_and_warning:sprobes [2023/06/05 07:47] (current) m-gamperl
Line 139: Line 139:
 We recommend to assemble as much as possible in the workshop/laboratory before going in the field to make the installation on site more efficient. In addition to the previous recommendation, for the nodes that are protected with PVC piping, although it is recommended to leave 50 cm of 6-axis cable, in some cases it is pertinent to leave a little more given that for future maintenance and revision of the node it is more practical that it can come out of the protection piping completely and this will allow a longer length of cable than the length of the protection piping. We recommend to assemble as much as possible in the workshop/laboratory before going in the field to make the installation on site more efficient. In addition to the previous recommendation, for the nodes that are protected with PVC piping, although it is recommended to leave 50 cm of 6-axis cable, in some cases it is pertinent to leave a little more given that for future maintenance and revision of the node it is more practical that it can come out of the protection piping completely and this will allow a longer length of cable than the length of the protection piping.
  
-{{technical_part:installation.png|Steps for Installation of the Sensors.}}+{{en:technical_part:installation.png|Steps for Installation of the Sensors.}}
  
 === Installation of Sensor Protection === === Installation of Sensor Protection ===
en/monitoring_and_warning/sprobes.txt · Last modified: 2023/06/05 07:47 by m-gamperl